Enertech Global, LLC 13
AV : MD/ME - Rev. A Models
Installaon and Operaons Manual

A New Era with Advantage
Enertech’s Advantage system was painstakingly engineered to
funcon awlessly between space condioning and domesc
hot water. Our indoor module has truly set the bar with the
rst turnkey total comfort soluon. With its integrated electric
or dual fuel opon, each backing up heang and DHW, you’ll
never be le out in the cold!
Safety Labeling and Signal Words
The signal words NOTICE, DANGER, WARNING, CAUTION, and
Note are used on product labels and throughout this manual
to idenfy levels of hazard seriousness.
“NOTICE” Nocaon of installaon, operaon or
maintenance informaon which is important, but which is
NOT hazard related.
“CAUTION” Indicates a potenally hazardous situaon or an
unsafe pracce which, if not avoided, COULD result in minor
or moderate injury, product or property damage.
“WARNING” Indicates a potenally hazardous situaon
which, if not avoided, COULD result in death or serious injury.
“DANGER” Indicates an immediate hazardous situaon
which, if not avoided, WILL result in death or serious injury.
“Note” Used to highlight suggesons which will result in
enhanced installaon, reliability, or operaon.

Upon receipt of any equipment, carefully check the shipment
against the packing slip and the freight company bill of lading.
Verify that all units and packages have been received. Inspect
the packaging of each package and each unit for damages.
Ensure that the carrier makes proper notaon of all damages
or shortage on all bill of lading papers. Concealed damage
should be reported to the freight company within 5 days.
If not led within 5 days the freight company can deny all
claims.
Note: Nofy Enertech Global, LLC shipping department of all
damages within 5 days. It is the responsibility of the purchaser
to le all necessary claims with the freight company.

Enertech units are mounted to wooden pallets for easy
handling during shipment and installaon. Units are protected
during shipment with durable cardboard corner posts, top and
air coil panels. Shrink wrap is applied covering the enre unit
and aachment to the pallet.
Upon receipt of the unit, carefully remove the shrink wrap.
Using a box cuer, slit the shrink wrap on the cardboard top
and corner posts. Use cauon to not damage the nished
surface of the unit. Keep all cardboard or other packaging
material for safe storage and transport to the job site prior to
installaon.
Remove the front service panel to locate technical documents;
manuals, bullens or instrucons and accessory items; HWG
piping kits, and strainers.
CAUTION
DO NOT OPERATE THE HEAT PUMP UNIT DURING
BUILDING CONSTRUCTION PHASE

Protect units from damage and contaminaon due to
plastering (spraying), painng and all other foreign materials
that may be used at the job site. Keep all units covered on
the job site with either the original packaging or equivalent
protecve covering. Cap or recap unit connecons and all
piping unl unit is installed. Precauons must be taken to
avoid physical damage and contaminaon which may prevent
proper start-up and may result in costly equipment repair.
Storage
All units should be stored inside in the original packaging, in
an upright posion at all mes. Units should not be stacked
unless specially noted on the packaging.
Removal and Disposal
All units removed from service should have all components,
oils, anfreeze and refrigerants properly disposed of
according to local and naonal environmental recycling codes,
regulaons, standards and rules.

Before you fully install the equipment, it is recommended you
do the following:
1. Fully inspect the unit after unpacking
2. Compare the electrical data on the unit nameplate with
packing slip and ordering information to verify that the
correct unit has been shipped.
3. Inspect all electrical connections and wires. Connections
must be clean and tight at the terminals, and wires
should not touch any sharp edges or copper pipe.
4. Verify that all refrigerant tubing is free of dents and
kinks. Refrigerant tubing should not be touching other
unit components.
5. Before unit start-up, read all manuals and become
familiar with unit components and operation.
Thoroughly check the unit before operating.
6. Locate the Unit Start-Up Form from this manual and
have it available as the unit installation proceeds.

Installaon locaon should include adequate service clearance
around the unit, and be oriented in a way that piping or other
permanently installed xtures do not have to be removed
for servicing. The Indoor Module should be located in a
condioned space where the ambient temperature remains
between 55
o
F and 95
o
F with a maximum RH of 78-80%.
Secon 3: Introducon & Operaonal Consideraons
CAUTION
THE EME/EMD SERIES EQUIPMENT IS DESIGNED FOR


INSTALL THE EME/EMD MODULE OR STORE IN A
CORROSIVE ENVIRONMENT OR IN A LOCATION
WHERE TEMPERATURE AND HUMIDITY ARE SUBJECT
TO EXTREMES. EQUIPMENT IS NOT CERTIFIED FOR
OUTDOOR APPLICATIONS. SUCH INSTALLATION WILL
VOID ALL WARRANTIES.
NOTICE
WHEN REMOVING PANELS, GIVE SPECIAL ATTENTION
TO CABINET INSULATION. INTERLOCKING INSULATION
EXTENDS BEHIND THE FRONT PLASTIC FAN GRATE. IF
NEEDED, REMOVE LEFT CORNER PANEL AND FRONT
PLASTIC FAN GRATE TO REMOVE INSULATION.