Enertech Global, LLC 19
AV : MD/ME - Rev. A Models
Installaon and Operaons Manual
Secon 4: Outdoor Installaon Consideraons
• Pipe installaon must be carried out in accordance with
current local and federal regulaons.
• The unit is not equipped with external shut o valves on
the load side; these must be installed to facilitate any
future servicing.
• The unit should be vented through the venng valve. This
is located on the load outlet leaving the unit and would be
used to bleed o excess air within the water lines. See the
illustraon.
• Be sure to use both of the supplied corrugated stainless
steel ex tubing, aaching them directly to the inlet and
outlet on the outdoor unit. These exible tubes act as
vibraon dampers. Be sure to t them so that an elbow is
created on both lines.
• When assembling the ex tubes to the unit be certain to
use a two wrench system of ghtening. One wrench used
to back up the staonary copper ng ,the other to turn
the corresponding end of the ex tube. Tighten by moving
the wrench on the ex tube.
• All of the outdoor tubing must be fully insulated. 1-5/8”
insulaon is included with the corrugated stainless steel
tubing kit .
1-5/8” Insulaon included with
Flex Tubing kit. 12 feet total.
24 Inches
1-1/4”
FIP Thread
1-1/4”
FIP Thread
LEK
Data
Serie.nr.
Art
.nr. 711453
OUT
IN
Backup Wrench
Required
If there is a risk of snow or ice falling from a roof, a protecve
roof or cover must be erected to protect the heat pump, pipes
and wiring.
Snow Stand (Available in 12” & 18” Models)