Enertech Global, LLC 58
AV : MD/ME - Rev. A Models
Installaon and Operaons Manual
The system should be inspected before it is commissioned. The inspecon must be carried out by a suitably qualied person. Fill
in the page for informaon about installaon data in the User manual.
Notes Signature Date
Piping System
System Flushed with Flush Cart
System Purged of Air
Anfreeze type and %
Flow Rate Veried
Electricity
Disconnects (indoor/outdoor)
Installed
Breaker and Wire Sizes Veried
Immersion Heaters Wired
Communicaon Cable Con-
nected
EAV Addressed (only when
cascade connecon)
High Voltage Measurement
(Outdoor)
High Voltage Measurement
(Indoor)
Transformer Tap (208V or
240V) Veried
Miscellaneous
Condensate Drain
Insulaon Condensate Drain,
Thickness
Note: Check the connecons, main voltage and low voltage before the machine is started, to prevent damage to the
heat pump electronics.
Secon 9: Equipment Start-Up