Enertech Global, LLC 58
AV : MD/ME - Rev. A Models
Installaon and Operaons Manual

The system should be inspected before it is commissioned. The inspecon must be carried out by a suitably qualied person. Fill
in the page for informaon about installaon data in the User manual.
 Notes Signature Date
Piping System
System Flushed with Flush Cart
System Purged of Air
Anfreeze type and %
Flow Rate Veried
Electricity
Disconnects (indoor/outdoor)
Installed
Breaker and Wire Sizes Veried
Immersion Heaters Wired
Communicaon Cable Con-
nected
EAV Addressed (only when
cascade connecon)
High Voltage Measurement
(Outdoor)
High Voltage Measurement
(Indoor)
Transformer Tap (208V or
240V) Veried
Miscellaneous
Condensate Drain
Insulaon Condensate Drain,
Thickness
Note: Check the connecons, main voltage and low voltage before the machine is started, to prevent damage to the
heat pump electronics.