EasyManua.ls Logo

Enterasys Matrix E1 1G694-13 - Hardware Installation; Required Tools

Enterasys Matrix E1 1G694-13
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware Installation 3-1
3
Hardware Installation
This chapter provides the instructions required to install the 1G694-13. Follow the order of the
sections as listed below to correctly install the switch.
Unpacking the switch (Section 3.2)
Installing options (Section 3.3)
Installing an optional Ethernet expansion module (Section 3.4)
Installing an optional Mini-GBIC (Section 3.5)
Installing an optional 10GBASE-LR (Section 3.6)
Tabletop or shelf installation (Section 3.7)
Rackmount installation (Section 3.8)
Connecting to the network (Section 3.9)
Connecting to the Console port for local management (Section 3.10)
Completing the installation (Section 3.11)
3.1 REQUIRED TOOLS
A Phillips screwdriver is required to install the switch into a rack.
Electrical Hazard: Only qualified personnel should install or service this unit.
Riesgo Eléctrico: Solamente personal capacitado debe de instalar o darle servicio a esta unida.
Elektrischer Gefahrenhinweis: Installationen oder Servicearbeiten sollten nur durch
ausgebildetes und qualifiziertes Personal vorgenommen werden.
Note: Read the Release Notes shipped with the switch to check for any exceptions to the
supported features and operation documented in this guide.

Table of Contents

Other manuals for Enterasys Matrix E1 1G694-13

Related product manuals