EasyManua.ls Logo

Epson WorkForce 600 - Page 116

Epson WorkForce 600
169 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EPSON WorkForce 600/EPSON Stylus OFFICE TX600FW/BX600FW/EPSON Stylus SX600FW/ME OFFICE 700FW Revision A
DISASSEMBLY/ASSEMBLY Disassembling the Printer Mechanism 117
Confidential
5. Peel off the Porous Pad Frame Right from the Right Frame and the Base
Frame.
Figure 4-60. Removing the Front Frame/Right Frame (2)
6. Remove the screw (x1) that secures the Front Frame and the Right Frame
together.
7. Release the dowel (x1) and the hook (x1) that secure the Right Frame, and
remove the Right Frame.
Figure 4-61. Removing the Front Frame/Right Frame (3)
8. Release the hook (x1), and remove the Front Frame.
Figure 4-62. Removing the Front Frame/Right Frame (4)
Double-sided tape
Porous Pad Frame Right
Right Frame
Dowel and hole
Base Frame
C.B.P. 3x6, F/Zn-3C (6±1kgfcm)
Front Frame
Right Frame
Hook
dowel
Align the ferrite core with the line mark shown in Figure. 4-63,
then secure it to the Front Frame with double-sided tape.
After replacing the Front Frame, be sure to attach acetate tape
as shown in the figure below.
Figure 4-63. Standard of acetate tape attachment
Before securing the Porous Pad Frame Right, align the hole of
the Porous Pad Frame Right with the dowel of the Right Frame
as shown in
Figure. 4-60.
Front Frame
Cutout
Hook
13mm
18mm
Line mark
Ferrite core

Table of Contents

Related product manuals