EasyManua.ls Logo

Farr HD8625 - Extreme Cold Weather Operation Procedures

Farr HD8625
156 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Technical Manual
hD8625 8-
5
/
8
” 35K Tong
2.25
Breaking A Connection (Continued)
n) Aligntheopeningintherotarygearwiththemouthofthetongoncethejawsarefree.Openthetongdoorandguidethetong
awayfromthestring,andusetheliftcylindercontroltolowerittothedrillfloorifdesired.
IllustratIon 2.H.11: lowerIng tong usIng lIft CylInDer Control
RIG PERSONNEL MUST STABILIZE THE TONG AS IT IS LOWERED TO THE DRILL FLOOR
o) Useyourrig’sstandardpipehandlingprocedurestoremoveandrackthefreedtubingstand.
p) Repeatsteps“e”through“p”asmanytimesasnecessarytobreakoutandun-threadthedesirednumberofconnections.
H. EXTREME COLD WEATHER OPERATION PROCEDURES
1) Consultthepowerunitengineoperator’smanualforallcoldweatheroperatingproceduresandprecautions.
2) Selectgearandbearinglubricantsthatarecompatiblewithexpectedclimaticconditions.
3) Selecthydraulicfluidthatiscompatiblewithexpectedclimaticconditions.
4) Allowhydraulicfluidtocirculateforapproximately20minutesafterstartingthepowerunit,priortoactivatingthebypassvalve
toallowfluidtocirculatetotong.Ifthepowerunitisequippedwithanoiltemperaturegauge,ensurethatthefluidhasreached
operatingtemperatureasspecifiedbyhydraulicfluiddatasheet.
5) Allowforadequatedryingofmoisture(priortolubricating)whencleaningtongpartsincoldweather.
seTup & operaTion

Table of Contents

Related product manuals