4 Electrical installation
54 Festo – GDCP-CMMP-M0-HW-EN – 1511c – English
Connect entire screening flush at the motor to the plug or motor housing; length maximum 40 mm
(guaranteed with NEBM-...).
Danger
All PE protective earth conductors must always be connected prior to commissioning for
reasons of safety.
The regulations of EN 50178 and EN 60204-1 for protective grounding must always be
observed during installation!

Table of Contents

Other manuals for Festo CMMP-AS-C5-11A-P3-M0

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Festo CMMP-AS-C5-11A-P3-M0 and is the answer not in the manual?

Festo CMMP-AS-C5-11A-P3-M0 Specifications

General IconGeneral
BrandFesto
ModelCMMP-AS-C5-11A-P3-M0
CategoryController
LanguageEnglish

Related product manuals