EasyManua.ls Logo

Festo CP Lab - Page 49

Festo CP Lab
114 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Design and function
© Festo Didactic Conveyor 49
Electirc connection application module
If an application module is connected to the CP Lab conveyor, the cable that is hardwired to X11 is plugged
into the SYS-Link connector of the I / O terminal. If the application module has an analogue interface, the
analogue terminal is plugged into the rear XZ2 board at interface X5.

Table of Contents

Related product manuals