EasyManua.ls Logo

Fiori DB 460 - Cement in Bags; Cement Loading

Fiori DB 460
252 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
100
4
OPERATION AND USE
id.:
DB 460 REV. 00 02/01/2015
4.10.6.a Cement in bags ( g. 35)
4.10.6 CEMENT LOADING
It is strictly prohibited to climb onto the vehicle, whether it is in the mixing phase
or stationary.
DANGER:
CAUTION: Wear a protective mask.
- Keep the drum rotating.
- Raise the bucket about 0.5 metres and hold it in fully tilted position with the hatch closed.
- Calculate the quantity of cement to be loaded referring to the CONCRETE COMPOSITION AND BATCHING
TABLE in chapter 4.10.4.
- Manually ll the bucket with cement, tearing open the bags on the serrated blade of the bucket.
- Remove the paper bags.
- Raise the arm to its maximum height.
- Open the unloading hatch and wait until the cement has poured into the drum through the hopper, helping it
along by vigorously shaking the bucket with the arm.
35

Table of Contents