EasyManua.ls Logo

Fiori DB 460 - Mixing and Second Filling with Water

Fiori DB 460
252 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
102
4
OPERATION AND USE
id.:
DB 460 REV. 00 02/01/2015
amount of material and reducing the arm raising time.
- Raise the arm to its maximum height while moving backward.
- Stop the vehicle.
- Open the unloading hatch and wait until the cement has poured into the drum through the hopper helping it
along by vigorously shaking the bucket with the arm.
- Approach the heap again while lowering the arm.
- Repeat the operations described above at least 8÷9 times. This is the bucket yield on average to obtain
optimal drum loading.
CAUTION: You can shift to reverse gear even if the vehicle has not completely stopped.
4.10.8. MIXING AND SECOND FILLING WITH WATER ( g. 38)
- Keep the drum rotating for about 2 minutes after the last aggregate loading phase.
- Add the remaining amount of water, about 30% of the total, following the procedures described in chapter
4.10.5 to obtain the desired uidity.
38

Table of Contents