107
4
OPERATION AND USE
id.:
DB 460 REV. 00 02/01/2015
4.10.9.e Concrete unloading from drum emergency door
- Raise the drum but not necessarily to its maximum height.
- Visually inspect regular concrete unloading.
- To move on to the next area after completing unloading in the fi rst area, follow the instructions below:
- Lower the drum if it is still relatively full and reposition it on the longitudinal axis.
- Revert the drum rotation direction to mixing (clockwise).
- Approach and position in the new unloading area and follow all the instructions given above.
This operation must be performed by Authorised FIORI Workshops qualifi ed
personnel.
DANGER: