EasyManua.ls Logo

Fiori DB 460 - Concrete Unloading from Drum Emergency Door

Fiori DB 460
252 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
107
4
OPERATION AND USE
id.:
DB 460 REV. 00 02/01/2015
4.10.9.e Concrete unloading from drum emergency door
- Raise the drum but not necessarily to its maximum height.
- Visually inspect regular concrete unloading.
- To move on to the next area after completing unloading in the fi rst area, follow the instructions below:
- Lower the drum if it is still relatively full and reposition it on the longitudinal axis.
- Revert the drum rotation direction to mixing (clockwise).
- Approach and position in the new unloading area and follow all the instructions given above.
This operation must be performed by Authorised FIORI Workshops qualifi ed
personnel.
DANGER:

Table of Contents