EasyManua.ls Logo

Fiori DB 460 - Aggregate Loading; Cement in Silos; Heaped Aggregate

Fiori DB 460
252 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
101
4
OPERATION AND USE
id.:
DB 460 REV. 00 02/01/2015
4.10.7.a Heaped aggregate ( g. 37)
- Keep the drum rotating at top speed.
- Lower the arm after checking that the hatch has closed.
- On the mechanical gearbox, select the 1st working speed (low).
- Dig into the heap with the bucket and at the same time raise the arm, that way lling the bucket with a larger
4.10.6.b Cement in silos ( g. 36)
4.10.7 AGGREGATE LOADING
37
4030
36
- Keep the drum rotating at top speed.
- Raise the bucket arm to its maximum height (4030 mm)
- Move to underneath the unloading point of the silo.
- Calculate the quantity of cement to be loaded referring to the CONCRETE COMPOSITION AND BATCHING
TABLE in chapter 4.10.4.
- Open the unloading hatch and ll the drum using the silo dosage system.

Table of Contents