Tap the progress bar to cycle through a summary of the
machine train which includes:
– the machine train (1); – number of measure loc-
ations still to be measure on the train; – estimated time
to complete to measure the machine train.
Shows currently selected machine. This is identified by the
red rectangle outside the machine.
Tap to show machine measure steps. This will include bal-
ancing, bump test or change of components and repairs.
In a balancing application, the balancing measure setup tab
appears here.