EasyManua.ls Logo

Framery 2Q - Page 142

Framery 2Q
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Framery 2Q Huddle
2. Install the seal to the U-profile on the right side of the pod from the ceiling to the floor.
Note: Start the installation with the end where the top is cut off at the edge of
the fold in the ceiling felt.
3. Cut the seal at the floor end.
142
Installation instructions
info@frameryacoustics.com

Table of Contents

Related product manuals