Framery 2Q Huddle
4. Cut 40 mm (1 9/16 in) off the top of the seal.
5. Install the other half of the seal to the U-profile on the left side of the pod from the
ceiling to the floor.
Note: Start the installation with the end where the top is cut off.
Note: Press the DC extension cord into the seal.
Note: If you installed the power cord from the roof, press the power cord into
the seal.
Installation instructions
info@frameryacoustics.com
143