EasyManua.ls Logo

Framery 2Q - Page 143

Framery 2Q
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Framery 2Q Huddle
4. Cut 40 mm (1 9/16 in) off the top of the seal.
5. Install the other half of the seal to the U-profile on the left side of the pod from the
ceiling to the floor.
Note: Start the installation with the end where the top is cut off.
Note: Press the DC extension cord into the seal.
Note: If you installed the power cord from the roof, press the power cord into
the seal.
Installation instructions
info@frameryacoustics.com
143

Table of Contents

Related product manuals