Framery 2Q Huddle
2. Push both halves of the pod at the same time slightly over vertical and hold.
Note: Hold the pod in place continuously until all the bolts in the walls are fully
tightened.
Note: You need two people to tighten the bolts on both sides at the same time.
3. Tighten the bolts (2 pcs) connecting the back and front halves of the pod in the floor
and wall module junction.
Tighten the bolts on both sides at the same time.
Installation instructions
info@frameryacoustics.com
51