EasyManua.ls Logo

Framery 2Q - Page 52

Framery 2Q
186 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Framery 2Q Huddle
4. Tighten the bolts (2 pcs) connecting the back and front halves of the pod in the middle
of the wall module.
Tighten the bolts on both sides at the same time.
5. Tighten the bolts (2 pcs) connecting the back and front halves of the pod in the roof
and wall module junction.
Tighten the bolts on both sides at the same time.
52
Installation instructions
info@frameryacoustics.com

Table of Contents

Related product manuals