Framery 2Q Huddle
8. Tighten the bolts (8 pcs per side) on the floor and wall module junction of the back and
front halves of the pod.
Tighten the bolts on both sides at the same time.
9. Tighten the bolts (8 pcs per side) on the roof and wall module junction of the back and
front halves of the pod.
Tighten the bolts on both sides at the same time.
54
Installation instructions
info@frameryacoustics.com