Framery 2Q Huddle
4. Install the upper corner frame of the left-hand side with M8x55 bolts (3 pcs) and M8
washers (3 pcs).
Note: Press the acoustic panel aside to reach the bolt holes. Make sure that
you return the acoustic panel to its original position.
5. Install the left-hand side frame with M8x55 bolts (3 pcs) and M8 washers (3 pcs).
Tip: Use a clamp to straighten the frames if needed.
58
Installation instructions
info@frameryacoustics.com