90
I-S
I (current)-Starting - Starting current I
S
Unit % (of main current I
1
)
Setting range 0 - 200
Factory setting 35
UPS
UpSlope t
up
- time for the transition from the starting current I
s
to the main current I
1
Unit s
Setting range 0,0 - 9,9
Factory setting 0,5
I-1
I (current)-1 - main current I
1
Unit A
Setting range MW 1700 Job......3 - 170
MW 2200 Job......3 - 220
MW 2500 Job......3 - 250
MW 3000 Job......3 - 300
MW 4000 Job......3 - 400
MW 5000 Job......3 - 500
TT 800 Job.....0.5 - 80.0
TT 2200 Job...3 - 220
TT 2500 Job...3 - 250
TT 3000 Job...3 - 300
TT 4000 Job...3 - 400
TT 5000 Job...3 - 500
Factory setting -
I-2
I (current)-2 - reduced current I
2
(only active in 4-step mode)
Unit % (of main current I
1
)
Setting range 0 - 100
Factory setting 50
dSL
DownSlope t
down
- time for the transition from main current I
1
to final current I
E
Unit s
Setting range 0,0 - 9,9
Factory setting 1,0
I-E
I (current)-End - Final current I
E
Unit % (of main current I
1
)
Setting range 0 - 100
Factory setting 30
JSL
Job Slope - For changing to another job during welding. "JSL" is the time that it takes for
the welding current to adjust seamlessly from the present job to the next.
Unit s
Setting range OFF / 0.1 - 9.9
Factory setting OFF
IMPORTANT! You can set the job slope "JSL" separately for each job that is stored.