EasyManua.ls Logo

Fujitsu Airstage J-II Series - Page 508

Fujitsu Airstage J-II Series
978 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Important
: Network Convertor will not operate if,
VRF network system address (Outdoor & Indoor units address) allocation information
are not registered to Network Convertor.
XIF data information and VRF network system address allocation information must
not be same.
Binding & Commissioning is not executed. (During binding, read out the Network
Convertor Neuron ID by pushing BMS service switch (SW 2) on the main PCB of
Network Convertor)
If the ID number registered to the Network Convertor is not same as the ID number
which is included in the XIF of Network Convertor.
- (05 - 145) -
CONTROL
SYSTEM
CONTROL
SYSTEM

Table of Contents

Related product manuals