EasyManua.ls Logo

Fujitsu Airstage J-II Series - Page 522

Fujitsu Airstage J-II Series
978 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Execute the Conguration Tool from the PC and perform necessary settings. For detail,refer
to the Instruction Manual,
6. Perform scan from the Conguration Tool, and check that all VRF indoor/outdoor units are
detected and available.
7. Remove the USB cable from the Gateway, and close the case.
At this point, BACnet
®
Gateway should be accessible from the BMS workstation.
Integration of BACnet
®
system is ready to be performed.
- (05 - 159) -
CONTROL
SYSTEM
CONTROL
SYSTEM

Table of Contents

Related product manuals