Installation abstract
NOTE:
The belows are electricity meter connection methods which can be adapted by the System
Controller and TPC (Touch panel controller). However, the following mentioned setting
restrictions must be observed.
(1) Multiple VRF Networks can connect to 1 electricity meter. (with network crossover)
NOTE:
UTY-ALGXZ1 (+UTY-PLGXE2) does not support multiple VRF Networks.
VRF Network system 1
VRF Network system 2
VRF Network system 3
VRF Network system 1
VRF Network system 2
VRF Network system 3
Whm
Whm
Whm
Whm
(2) With the electricity charge apportionment function, an electricity meter system cannot span
TPC.
Whm
Whm
Whm
Whm
TPC1 management range
TPC2 management range
TPC2
TPC1
Create an electricity meter system within
the range of the units managed by each
TPC.
Whm
Whm
Whm
TPC1 management range
TPC2 management range
TPC2
TPC1
An electricity meter system spanning
units managed by TPC cannot be
created.