EasyManua.ls Logo

GE ALPS - Undervoltage Test

GE ALPS
366 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Power Management
ALPS Advanced Line Protection System 5-5
5 FUNCTIONAL TESTS (FACTORY SETTINGS) 5.2 MEASURING UNIT TESTS
5
3. For this test remove the relay from test mode and assign TOCTRP to A1.
(2007) A1 = index 119; TOCTRP
4. Apply
I
op
at 3.0 (0.6) A rms and start the timer. Leave the current on until the A1 contact close and stop the timer. The
51G should time out in 2.8 to 3.2 seconds.
5. Reduce
I
op
to zero.
6. Repeat steps 3 and 4 with values for
I
op
from the table below. Verify that the 51G times out within the specified time.
7. Restore these Protection settings
OVERCURRNT
(610) 51G =
Pretest setting
(611) 51G_DIRCNL =
Pretest setting
(612) 51GPICKUP =
Pretest setting
(615) 51GTIMDIAL=
Pretest setting
OUTPUTS
(2007) A1 =
Pretest
setting
5.2.9 UNDERVOLTAGE TEST
1. Connect the relay as shown in Figure 5–2: GROUND REACH TIMER TEST CONNECTIONS on page 5–7.
2. Set the voltage inputs to the following values:
VA: 67 volts rms
VB: 67 volts rms –120°
VC: 67 volts rms +120°
3. Set
I
op
to zero Amps.
4. Set the relay into test mode 48 The LUI displays UNDERVOLTAGE ON
5. Set phase A voltage to 35 V and check that contact A1 closed. Set phase A voltage back to 67 V and check that con-
tact A1 opens. Repeat for phase B and C.
5.2.10 T9 – T10 – OVERVOLTAGE TEST
1. Connect the relay as shown in Figure 5–2: GROUND REACH TIMER TEST CONNECTIONS on page 5–7 and make
the following Protection settings:
VOLTAGE
(701) RATEDVOLTS = 115 (V rms)
(702) PHASEOVER = YES
(703) PHOVPICKUP = 1.10 (pu Volts)
(704) PHOVTMDLY = 0.5
2. Set the relay into test mode 47. The LUI displays OVERVOLTAGE ON
3. Set the voltage inputs to the following values:
VA: 67 volts rms
VB: 67 volts rms –120°
VC: 67 volts rms +120°.
4. Set
I
op
to zero Amps.
5. Set phase A voltage to 74 V and check that contact A1 is closed. Set phase A voltage back to 67 V and check that con-
tact A1 opens. Repeat for phases B and C.
I
OP
, A RMS 51G TIME OUT, S
3 2.8 to 3.2
6 0.9 to 1.1
10 0.6 to 0.8

Table of Contents

Related product manuals