EasyManuals Logo
Home>GE>Monitor>Dash 3000

GE Dash 3000 Service Manual

GE Dash 3000
282 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #213 background imageLoading...
Page #213 background image
Functional and electrical safety checks: Electrical safety tests
2000966-542D Dash 3000/4000/5000 8-13
Neutral – CLOSED
GND (Earth) – OPEN
8. Read and record the current leakage indicated on the tester.
9. Change leakage tester switches to:
Polarity – REVERSED
Neutral – CLOSED
GND (Earth) – OPEN
10. Read and record the current leakage indicated on the tester.
11. Change leakage tester switches to:
Polarity – REVERSED
Neutral – OPEN
GND (Earth) – CLOSED
12. Read and record the current leakage indicated on the tester.
13. Change leakage tester switches to:
Polarity – REVERSED
Neutral – CLOSED
GND (Earth) – CLOSED
14. Read and record the current leakage indicated on the tester.
15. Set the power switch of the device to OFF.
16. Repeat the steps in this procedure using the appropriate SPO2 Test
Body. Connect the SPO2 Test Body to the blue SPO2 connector of the
device under test.
Acceptance criteria NC
With Ground and Neutral CLOSED – If reading is greater than 10 µA,
the device under test fails. Contact GE Technical Support
Acceptance criteria SFC – ground (earth), line or neutral open
If any reading is greater than 50 µA, the device under test fails. Contact
GE Technical Support.

Table of Contents

Other manuals for GE Dash 3000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Dash 3000 and is the answer not in the manual?

GE Dash 3000 Specifications

General IconGeneral
BrandGE
ModelDash 3000
CategoryMonitor
LanguageEnglish

Related product manuals