EasyManuals Logo
Home>GE>Monitor>Dash 3000

GE Dash 3000 Service Manual

GE Dash 3000
282 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #217 background imageLoading...
Page #217 background image
Functional and electrical safety checks: BISx (option) current leakage tests
2000966-542D Dash 3000/4000/5000 8-17
3. Connect the BISx power supply cord to the power outlet on the
leakage tester.
4. Turn the BISx ON by connecting the AC power adaptor.
5. Read the leakage current indicated on the tester.
6. Change the leakage tester switches to:
Polarity – NORMAL
Neutral – OPEN
GND (Earth) – CLOSED
7. Read and record the leakage current indicated on the tester.
8. Change leakage tester switches to:
Polarity – NORMAL
Neutral – CLOSED
GND (Earth) – OPEN
9. Read and record the current leakage indicated on the tester.
10. Change leakage tester switches to:
Polarity – REVERSED
Neutral – CLOSED
GND (Earth) – OPEN
11. Read and record the current leakage indicated on the tester.
12. Change leakage tester switches to:
Polarity – REVERSED
Neutral – OPEN
GND (Earth) – CLOSED
13. Read and record the current leakage indicated on the tester.
14. Change leakage tester switches to:
Polarity – REVERSED
Neutral – CLOSED
GND (Earth) – CLOSED
15. Read and record the current leakage indicated on the tester.
16. Set the power switch of the device to OFF.
17. Leave the test configuration set up for the sink leakage test.
Acceptance criteria NC
If any reading with the ground and neutral closed is greater than 100 uA,
the BISx fails this test. Contact GE Technical Support.

Table of Contents

Other manuals for GE Dash 3000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Dash 3000 and is the answer not in the manual?

GE Dash 3000 Specifications

General IconGeneral
BrandGE
ModelDash 3000
CategoryMonitor
LanguageEnglish

Related product manuals