GE
D
IRECTION FQ091019, REVISION 2 VIVID Q N SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-39
2) Re-connect the two TR32 Boards to each other (gently press together as shown in Figure 8-43 on
page 8-37).
3.) Connect the TR32 Boards to the RFI Board (gently press together as shown in Figure 8-42 on page
8-36).
4.) Return the TR32 and RFI Board assembly to the system, placing it in position on the Bottom
Assembly. (While performing this step, gently lift one side of the P&M Board upwards and hinge it
open in order to insert the TR32 and RFI Board assembly underneath). Refer to Figure 8-40 and
Figure 8-41 on page 8-36.
5.) Reconnect each of the two HVPS cables to the DC Power Supply (see Figure 8-39 on page 8-35).
6.) Reconnect the PCI cable flex (BEP-to-RFI) to the cable connector on RFI Board (see Figure 8-38
on page 8-35).
7.) Return the eight screws and fasten the TR32 and RFI Board assembly firmly in position on the
Bottom Assembly (refer to Figure 8-36 and Figure 8-37 on page 8-34).
8.) Return the Control Panel and Keyboard to its original position, as described in the "Control Panel
and Keyboard Installation Procedure" on page 8-12.
9.) Return the bearing handle, as described in the "Bearing Handle Installation Procedure" on page
8-3.
10.)Proceed to perform the following functionality tests:
- "SafeLock Cart - Grounding Continuity" on page 10-22 - only if the Vivid q N system is
currently mounted on the SafeLock cart
- "SafeLock Cart - Chassis Current Leakage Test" on page 10-24
- "Calibration Tests" on page 7-25
- "Full System Test" on page 7-10