GE
D
IRECTION FQ091019, REVISION 2 VIVID Q N SERVICE MANUAL
8-50 Section 8-3 - Internal Component Replacement Procedures
8-3-5-5 DC-to-DC Power Supply Installation Procedure
NOTE: When performing the following installation procedure steps, it may be helpful to review the
appropriate movie clips previously referenced in the DC-to-DC Power Supply Removal
Procedure.
1) Return the HVPS to its original position - refer to Figure 8-58, above.
2.) Return the five screws and fasten the HVPS in position on the Bottom Assembly, as shown in Figure
8-57 on page 8-49.
3.) Reconnect each of the two Power Supply cables to the DC Power Supply (HVPS-to-BEP and
HVPS-to-RFI), as shown in Figure 8-56 on page 8-48.
4.) Return the bearing handle, as described in the "Bearing Handle Installation Procedure" on page
8-3.
5.) Make sure the Vivid q N LCD Display cover is securely closed and place the scanner face down.
Re-install the battery as described in the "Battery Installation Procedure" on page 8-5.
6.) Proceed to perform the following functionality tests:
- "SafeLock Cart - Grounding Continuity" on page 10-22 - only if the Vivid q N system is
currently mounted on the SafeLock cart
- "SafeLock Cart - Chassis Current Leakage Test" on page 10-24
- "Calibration Tests" on page 7-25
- "Full System Test" on page 7-10