Malfunctions - Diagnosis – Repair GEDA
®
MINI 60 S / MAXI 120 S / MAXI 150 S
Assembly and Operating Manual 76 / 90 BL068 GB Edition 03/2015
9.1 Fault table
In the following table you will find potential faults and the appropriate
remedial action.
move
Mains fuse
Control fuse
Check mains fuse and re-
place / switch on if necessary
Check / correction
(Refer to Chapter 9.2.2)
pressed
Slack rope switch operated
Overtemperature of the drive
motor
STOP button
Tension the wire rope
(Refer to Chapter 9.2.3)
Wait until the drive motor has
cooled down and reduce the
load
erate full power
Voltage drop of more than
10 %
Select a supply cable or ex-
tension cable with a greater
cross section
DOWN
switch functional
UP/overload limit switch
is folded up
Overload protection has trig-
gered
Rope weight has moved
Move downwards
one side of the rope
drum
Vertical frame (scaffolding)
not installed vertical
Winch not adjusted horizontal
Use a spirit level to align the
vertical frame (scaffolding)
Position the winch horizontal-
ly