Rev. 00 02/21
OptiCenter OC09 Assembly / Connection
53
Assembly / Connection
Set-up
The powder management center is used in combination with powder
coating plants.
Installation work to be done by the customer must be carried out
according to local safety regulations!
Surrounding temperature too high
– Install the OptiCenter only in locations with an ambient
temperature of between +10 °C and +40 °C, i.e. never next to
heat sources (such as an enameling furnace) or electromagnetic
sources (such as a control cabinet).
Grounding of the powder management center
Missing or incorrect grounding
A poor or missing ground connection can be dangerous to the
operator.
► Ground all OptiCenter metal parts in accordance with general
local regulations.
► Check grounding regularly.
A corresponding connection point at the rear of the OptiCenter is reserved
for the potential equalization.