EasyManua.ls Logo

Gema OptiCenter OC09 - Page 61

Gema OptiCenter OC09
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rev. 00 02/21
OptiCenter OC09 Operation
61
2.
3. After the reposition, the coating screen shows the selected device
configuration:
In this example, the configuration is displayed with a fresh powder
system and covered level sensors and the sieve is switched on.
4. If a US sieve** has already been configured, insert and close the
OptiHopper cover with the appropriate mesh size
If there are several mesh sizes, the corresponding menu
appears for selecting the mesh size used
ATTENTION
Overheating of the US sieve**
The US sieve can break if it has already been configured in the
configuration menu and is not inserted in the OptiHopper (dry
operation).
Insert US sieve into the OptiHopper
ATTENTION
Clogging of the US sieve**
The US sieve can become clogged if it has not been configured in
the configuration menu and is still inserted in the OptiHopper
(operation without or with insufficient sieving capacity).
Set US sieve parameters correctly

Table of Contents

Related product manuals