Start Up - Airless
24 3A6748B
Start Up - Airless
Perform the start up procedure each time the
sprayer is started for the first time after it has
been cleaned or stored.
1. Perform Pressure Relief Procedure,
page 19.
2. Fill material hopper with pre-mixed
texture material. Bag roller sold
separately.
3. Prime pump.
a. Place material hose in hopper.
b. Turn ON/OFF Switch to ON.
c. 6912 only
: Place Pump Mode
Switch in up position.
d. Turn Pressure Control Knob
clockwise 1/4 turn.