DTS-60A OPERATORS MANUAL
64
5.4.2 Script File Test Examples
In order to make clear the above descriptions two examples will be
mentioned. The first one concerns the IEC 156/63 International Standard
and the other a more complicated scenario.
a. IEC 156/63 International Standard
The IEC_156/63 Standard is a 6 Stages program. Every stage is
independent, which means that it is desired that every stage will have a
breakdown. After filling the oil sample it is required to wait for 10 minutes.
Every stage voltage will start from zero until breakdown, with a voltage
increase rate of 2kV/s. After every breakdown, the test will store the output
voltage (breakdown voltage) and then it is desired to wait for 5 minutes with
the stirrer enabled for 1 minute. After every breakdown the test will proceed
to the next stage. Finally, it is required for the system to print a results
report.
The IEC 156/63 Standard should be described in a Script Test File as follows:
Script File 1 – IEC_156/63 Standard
prg 0 new IEC-156/95 2.5 0.05 mm type_I_II 00:05:00 00:05:00 06
prg 0 stage 00 002.0 kV/s breakdown 00:10:00 00:02:00 00:02:00 next store
prg 0 stage 01 002.0 kV/s breakdown 00:10:00 00:02:00 00:02:00 next store
prg 0 stage 02 002.0 kV/s breakdown 00:10:00 00:02:00 00:02:00 next store
prg 0 stage 03 002.0 kV/s breakdown 00:10:00 00:02:00 00:02:00 next store
prg 0 stage 04 002.0 kV/s breakdown 00:10:00 00:02:00 00:02:00 next store
prg 0 stage 05 002.0 kV/s breakdown 00:10:00 00:02:00 00:02:00 end store
prg 0 end