To reduce external magnetic field, note the following in facility construction such
main power line and air conditioning:
Do not cross the distribution panel location for the computer system and the
primary side main-line cable construction route in the ceiling of the compute
roomoronthefloor.Makethecablerouteasshortaspossiblewhen
constructing along the wall of the computer room.
The location of the air conditioning control panel and the cable construction
routeoftheprimarysidemainlineshouldbethesameasmentionedabove.
Themain-linecabletypemustbemulti-strand.Ifyouusesingle-strandcable
minimize the distance between cables in each phase.
Computer
Distribution
Panel
Computer
Main
Line
Distribution
Panel
Main
Line

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hitachi GR2000 Series and is the answer not in the manual?

Hitachi GR2000 Series Specifications

General IconGeneral
BrandHitachi
ModelGR2000 Series
CategoryNetwork Router
LanguageEnglish

Related product manuals