COMMISSIONING
8. Commissioning
8.1 Checks prior to operation
• Check the water pressure in the heating system
• Check the oil level in the oil tank with a dipstick
• Open shut-o󰀨 valve in the heating ow and return
• Check fresh air supply to the heating system
• Check the settings for the operating modes
• Check the settings for the boiler control elements
• Check the oil supply to the burner (open the shut-o󰀨
slide valve in the oil line)
• Check the electrical power supply (switch on fuse, turn
the emergency switch to “On” or connect the plug)
8.2 Switching on
1. Turn on main switch (if tted).
2. Set blocking switch to “I”.
3. Set the basic program and temperature on the boiler
(chapter 5.4).
8.3 Commissioning
!
WARNING
Danger of poisoning due to incorrect com-
missioning!
Initial commissioning of a newly installed
system may only be carried out by a heating
specialist. A full installation inspection must
be completed prior to start-up.