104
-----------------------------------------------------------------------------
XGE1/0/1 PRIMARY ACTIVE 5 16:45:20 2014/04/21
XGE1/0/2 SECONDARY STANDBY 1 16:37:20 2014/04/21
Smart link group 2 information:
Device ID : 000f-e23d-5af0
Preemption mode : ROLE
Preemption delay: 1(s)
Control VLAN : 110
Protected VLAN : Reference Instance 2
Member Role State Flush-count Last-flush-time
-----------------------------------------------------------------------------
XGE1/0/2 PRIMARY ACTIVE 5 16:45:20 2014/04/21
XGE1/0/1 SECONDARY STANDBY 1 16:37:20 2014/04/21
Use the display smart-link flush command to display the flush messages received on a device.
# Display the flush messages received on Device B.
[DeviceB] display smart-link flush
Received flush packets : 5
Receiving interface of the last flush packet : Ten-GigabitEthernet1/0/2
Receiving time of the last flush packet : 16:25:21 2014/04/21
Device ID of the last flush packet : 000f-e23d-5af0
Control VLAN of the last flush packet : 10
Smart Link and Track collaboration configuration example
Network requirements
As shown in Figure 26:
• Device A, Device B, Device C, and Device D form maintenance domain (MD) MD_A of level 5.
Device C is a Smart Link device, and Device A, Device B, and Device D are associated devices.
Traffic of VLANs 1 through 200 on Device C is dually uplinked to Device A by Device B and
Device D.
• Configure the collaboration between Smart Link the CC function of CFD through track entries
so that traffic of VLANs 1 through 100 is uplinked to Device A by Device C through
Ten-GigabitEthernet 1/0/1 (primary port of smart link group 1). Traffic of VLANs 101 through 200
is uplinked to Device A by Device C through Ten-GigabitEthernet 1/0/2 (primary port of smart
link group 2). When the link between Device C and Device A fails, traffic is quickly switched to
the secondary port of each smart link group, and switched back to the primary ports after the
fault is cleared.
For more information about CFD, see "Configuring CFD."