2. If removed, install the riser cage.
3. Install the access panel.
4. Install the server into the rack.
5. Connect all peripheral cables to the server.
6. Connect each power cord to the server.
7. Connect each power cord to the power source.
8. Power up the server on page 43.
9. If removed, install the front bezel.
54 Operations