7. Install the access panel.
8. Install the server into the rack.
9. Connect all peripheral cables to the server.
10. Connect each power cord to the server.
11. Connect each power cord to the power source.
12. Power up the server on page 43.
13. If removed, install the front bezel.
The installation is complete.
Power supply option
Hot-plug power supply calculations
For hot-plug power supply specifications and calculators to determine electrical and heat loading for the
server, see the Hewlett Packard Enterprise Power Advisor website (http://www.hpe.com/info/
poweradvisor/online).
Installing the redundant power supply assembly
CAUTION: All power supplies installed in the server must have the same output power capacity.
Verify that all power supplies have the same part number and label color. The system becomes
unstable and might shut down when it detects different power supplies.
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all
bays are populated with either a component or a blank.
WARNING: To reduce the risk of personal injury from hot surfaces, allow the power supply or power
supply blank to cool before touching it.
110 Hardware options installation