14. Install the riser cage.
15. Ensure that the GPU bracket is secured with the latch on the air baffle.
16. Connect the power cable to GPU installed in secondary riser cage.
17. Install the access panel.
18. Install the server into the rack.
19. Connect all peripheral cables to the server.
20. Connect each power cord to the server.
21. Connect each power cord to the power source.
22. Power up the server on page 43.
The installation is complete.