10. Connect the Mini-SAS cables.
11. Install the drives.
12. Disconnect the existing power cable.
13. Connect the power cable.
14. Install the air baffle.
15. Install the access panel.
16. Install the server into the rack.
17. Connect all peripheral cables to the server.
18. Connect each power cord to the server.
19. Connect each power cord to the power source.
20. Power up the server on page 43.
21. If removed, install the front bezel.
The installation is complete.
Installing the rear 2-bay SFF drive cage
Prerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
62 Hardware options installation