Procedure
1. If installed, remove the front bezel.
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Do one of the following:
• Extend the server from the rack.
• Remove the server from the rack.
6. Remove the access panel.
7. Remove the air baffle.
8. Remove the 8-bay SFF drive box blank.
9. Install the 8-bay SFF drive cage.
Hardware options installation 61