• Primary riser cage
• Secondary riser cage
9. If installing the expansion board, do it now.
10. Install the riser cage.
11. Install the access panel.
12. Install the server into the rack.
13. Connect all peripheral cables to the server.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. Power up the server on page 43.
The installation is complete.
Installing a PCIe riser cage
Prerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
92 Hardware options installation