EasyManua.ls Logo

HPE ProLiant DL180

HPE ProLiant DL180
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Do one of the following:
Extend the server from the rack.
Remove the server from the rack.
5. Remove the access panel.
6. If installing secondary riser cage, remove one of the following:
Secondary riser cage blank
Rear 2-bay SFF drive cage
Hardware options installation 93

Table of Contents

Related product manuals