EasyManua.ls Logo

HPE ProLiant DL180

HPE ProLiant DL180
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
b. Install the rear 2-bay SFF drive cage, and then install the screws.
10. Connect the Mini-SAS cable or the SATA and the SATA management port cables.
11. Connect GPU and rear 2-bay SFF power cable.
12. Install the drives.
13. Install the air baffle.
14. Install the access panel.
15. Install the server into the rack.
16. Connect all peripheral cables to the server.
17. Connect each power cord to the server.
18. Connect each power cord to the power source.
19. Power up the server on page 43.
64 Hardware options installation

Table of Contents

Related product manuals