FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
3 Hardware Installation
Copyright © Huawei Technologies Co., Ltd.
112
Figure 3-94 Connecting strong-current power cables to MCBs (2)
Installing Panels
1. Reinstall the circuit breaker panel.
2. Secure filler panels to the rack rails on the rear door, as shown in Figure 3-95.
Install filler panels according to the U position markings on the cabinet. Ensure that filler panels fully
cover the rack rails.
Figure 3-95 Installing filler panels

Table of Contents

Other manuals for Huawei FusionModule800

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionModule800 and is the answer not in the manual?

Huawei FusionModule800 Specifications

General IconGeneral
BrandHuawei
ModelFusionModule800
CategoryStorage
LanguageEnglish

Related product manuals