IDS1000-A Air-Cooled Container Data Center
All-in-One Maintenance Guide
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2.2 Obtaining Technical Documents
Table 2-2 lists the technical documents required for IDS1000 O&M.
Table 2-2 Document list
Obtaining Method
(Remarks)
Initial Configuration Guide
Provides guidelines for
initial configuration of the
IDS1000.
Obtain the document as
instructed by the solution
in use.
Downloaded from
http://e.huawei.com.
Provides a quick guide for
IDS1000 installation.
Obtain the document as
instructed by the solution
in use.
Downloaded from
http://e.huawei.com.
IDS1000-A Air-Cooled
Container Data Center
V200R002 All-in-One
Installation Guide
Describes how to install
the IDS1000.
Downloaded from
http://e.huawei.com.
IDS1000-A Air-Cooled
Container Data Center
V200R002 All-in-One
Commissioning Guide
Describes how to power
on, commission, shut
down, and power off the
IDS1000.
Downloaded from
http://e.huawei.com.
ECC500 V600R001C01 User
Manual
Describes how to operate
and maintain the collector.
Downloaded from
http://e.huawei.com.
iManager NetEco Product
Document - (NetEco Version)
Describes how to install,
configure, and commission
the management system.
The NetEco version depends
on the version in use. Click
on the NetEco WebUI to
obtain the information about
the NetEco version. If the
NetEco version is iManager
NetEco V600R002C40, see
the iManager NetEco
Product
Document-(V600R002C40)
for details.
The document can be
downloaded from
http://e.huawei.com.
IDS1000 Container Data
Center Single-Zone Fire
Extinguishing System User
Manual (Standard)
Describes how to perform
the O&M for the fire
extinguishing system.
Downloaded from
http://e.huawei.com.