Documents required: fire extinguishing device layout diagram
Skill requirement: fire extinguishing engineer
For the diagram, see the initial configuration guide.
Procedure
Step 1 Remove the screws on the panel of the emergency abort button using a Phillips screwdriver,
and remove the panel, as shown in Figure 5-59.
Figure 5-59 Removing the panel
Step 2 Disconnect the cables from the emergency abort button.
Step 3 Connect cables to the terminals of the spare emergency abort button. Ensure that the polarities
of the cable are correct.
Step 4 Reinstall the panel of the emergency abort button in reverse order of Step 1.
----End
Follow-up Procedure
Dispose of the removed emergency abort button that is confirmed faulty.
5.5.7 Replacing a Battery in the VESDA Power Box
Prerequisites
A battery in the VESDA power box is faulty.
A spare VESDA power box battery of the same model is available and functional.
Impact on the System
None