IDS1000-A Air-Cooled Container Data Center
All-in-One Maintenance Guide
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Obtaining Method
(Remarks)
UPS2000-G-(6 kVA-20 kVA)
User Manual
Describes how to operate
and maintain the UPS.
Downloaded from
http://e.huawei.com.
UPS5000-E-(40 kVA-320
kVA) User Manual
Describes how to operate
and maintain the UPS.
Downloaded from
http://e.huawei.com.
NetCol5000-A 20 kW Air
Cooled In-row Precision Air
Conditioner User Manual
Describes how to operate
and maintain the air
conditioners.
Downloaded from
http://e.huawei.com.
Documents delivered with
the fire control panel
Describes how to install
and commission the fire
control panel.
Delivered with the fire
control panel.
2.3 O&M Personnel Skill Requirements
Table 2-3 describes the skill requirements for the IDS1000 O&M personnel.
Table 2-3 IDS1000 O&M personnel skill requirements
Personnel Skill Requirement
Power Supply and
Distribution
System
Familiar with the power supply and distribution system
configurations and the operations for each core component in the
IDS1000
With power distribution system engineer qualifications
Familiar with the cooling system configurations and the
operations for each core component in the IDS1000
With cooling engineer qualifications
Familiar with the IDS1000 management system configurations
and device data upload methods, and able to proficiently operate
the IDS1000 management system
With weak-current engineer qualifications
Fire extinguishing
system
Familiar with the fire extinguishing system configurations and the
operations for each core component in the IDS1000
Experienced in fire extinguishing system maintenance
Familiar with the overall configurations and layout of the
IDS1000
Experienced in maintaining the IDS1000
Other systems include the lighting and structural systems.