1.1 Definition
Commissioning refers to the process of verifying the running of the device, the communication
of the device with the NMS and other interconnected devices, and ensuring that the device can
be used as required.
1.2 Commissioning Flow
This topic provides the prerequisites and basic flow for commissioning the device.
NOTE
This flow is for the commissioning procedures in newly-created offices. For the existing offices, adjust the
commissioning procedures and contents according to the actual situation.
Prerequisites
The hardware installation personnel must have installed and checked the UA5000 hardware.
Flowchart
This document describes how to commission the UA5000 in the following steps.
Figure 1-1 provides the commissioning flowchart.
Figure 1-1 Commissioning flowchart
End
Start
Commissioing
preparations
Stand-alone
commissioning
Interconnection
Commissioning
Maintenance and management
commissioning
The following topics provide a brief description about the contents of each chapter:
UA5000 Universal Access Unit Product
Commissioning Guide-PVM CLI 1 Commissioning Description
Issue 04 (2012-06-25) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2

Table of Contents

Other manuals for Huawei UA5000

Related product manuals