2.1 Hardware Check
This topic describes how to check the hardware before the commissioning. Make sure that the
hardware is available and check the hardware before the commissioning to facilitate the
subsequent operations.
Checklist
Table 2-1 provides the checklist for checking the hardware before the commissioning.
Table 2-1 Hardware checklist
No. Item Description
1 Power and
grounding
l Ensure that the power cable and the ground cable are properly
connected.
l Ensure that the power cable, ground cable, and power
distribution switch are labeled correctly, clearly and orderly.
l Ensure that the connectors of external ground cables and
protection ground cables of the cabinet are properly
connected, and they are not damaged.
l Ensure that the power supply of the device is in the normal
state.
2
Cables and
connectors
l Ensure that the cable connectors are tight and firm.
l Ensure that the cable jacket is intact.
l Ensure that the cable labels are clear and neat.
l Ensure that cables are bundled reliably.
3 Upper layer
device
l Check the physical position of the interconnection port on the
upper layer device.
l Ensure that the upper layer device works in the normal state
and can be used for commissioning.
NOTE
The hardware installation personnel must check the device according to items "Power and grounding" and
"Cables and connectors" in Table 2-1 when performing the installation check. The commissioning
personnel can check these two items again to ensure that the hardware connection is reliable during the
commissioning.
2.2 Software Requirements
This topic describes the software requirements for the commissioning. You need to prepare the
commissioning software before the commissioning to facilitate the subsequent operations.
UA5000 Universal Access Unit Product
Commissioning Guide-PVM CLI 2 Commissioning Preparations
Issue 04 (2012-06-25) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5

Table of Contents

Other manuals for Huawei UA5000

Related product manuals